Before an ISP can be arranged the fibre has to be live at the track box, which I understand is the case from Tuesday 19th Oct. The line has to be tested and then Openreach have to make it available commercially.
Part 1 The box was dug in✓
Part 2 Fibre was pulled through to the box andconduit laid the workshop.✓
Part 3 I now have to lay further conduit around and along the outside of the workshop to carry fibre from the track box to the ONT ✓
The ONT I hope is the Nokia Alcatel 7368 G-010G-A Huawei HG8010H5-20
Going with Zen Internet