FTTP > Track Access Box

June 7th: The ducting of for FTTP (Fibre To The Premises) has been incorporated with an access box in the track that hacks in to the BT (Open Reach) telephone conduit. There is then a narrower plastic pipe under the boundary wall to the back of the workshop.

June 8th: I've fitted analuminium pipeover the plastic conduit to help protect it from damage, especially that of any strimmer or brush cutter work.

View of structure and innards of fttp box

Position of box relative to workshop

Position along track on descent

July 16th: Added removed soil to concrete margin.

July 17th: Tamped and wet soil.

Oct 19th: Turfed and growing nicely

Nov 25th: Covered completely

Thin wood was laid to cover the cast iron lid, so will have to wait a year to see how it fares over the dry periods.
July 16 - 17th: Used stones from rubble to level parking slot

July 16 - 17th: Rubble roughly level; will require time and vehicles to settle and compress.