Work on Entrance PorchUpdated: July 18th, 2025
Created: September 26th, 2024The porch will initially stretch between the two interrupts in the south facing wall that extends just beyond the double door. The outer width of the interrupts being 222cm. Given some degree of overhang in width, some 333cm may be the roof width.
The west edge having steps to the ground. I may later extend the platform east to the edge of the cabin.
The floor of the porch will be a little over 1m and the roof some 1.23m
2025
- July 9 -15th: Made three pyramids with copper spigots
- July 14th: Preparing part of Boy Eric's Jib for awning.
- July 17th: Make extra central pillar | Attached one pyramid to south pillar | Raised north pillar
- July 18th: Finished building the pillars with pyramids and spigots. Require 3 x ten foot poles.

porch pillars
2024
- Oct. 14th: Rough drawings and measure glass size
- Build fittings on stoneworks with copper pins to locate vertical posts
- Build fittings on stoneworks with copper pins to locate vertical posts
- Get wood for basic frame
- three pieces of wood some 333cm long for base beam, stanchion rail and roof purlin
- two vertical posts
- two 'rafters'
- Get glass size
Diary: Starting September 2024
- Sept 28th: Refashioned the 'steps' ~ Second stone base made.

Reset steps to facilitate building porch.
Brick base to the left/west is under the aluminium sheet to keep the rain off for the night. To the right/east is the small brick/stone work under the red 'triangle' - Sept 26th: Prompting the work on the 'steps' was the start of making stone bases for posts/stanchions. The idea is to have 2 vertical posts to support a porch.