Himalayan Balsam 2010Updated: June 24th, 2010
Created: June 24th, 2010Site 1
Aerial Photo(2005) of Site 1
The above photo is aligned, North to the top of page. The red outline is the approx boundary of work. The eastern limit follows the drainage ditch of the lower field.
Detail of Site 1
The letters are in the order that the site is being cleared.
The red line is the track between the upper field and the lower fen meadow.
The double 'yellow and green' lines are the western and eastern boundaries, respectively, of the drainage ditch separating the upper field and the fen meadow.
Sites 3 to 6
Map of Sites 3 to 6(2008)
Aerial Photo(2005) of Sites 3 to 6(2010)
Site 3 is extended a)to include the track leading north b) to cover the land between the bund and the drainage ditch, and c) to includes land belonging to Trekensa Gardens where it adjoins a) on it's western boundary and the SSSI on it's southern boundary
Site 4 is extended to about 30m to the west of the north-south bund.
October:
- 8th October: Cleared all of Site 1. (Collected only 185 plants)
- 8th October: Cleared Sites 3,6 and the top edge of 4 and 5. (78 plants)
- 25th October: Haven't checked since I've been away. Hoping the frost killed the remaining stragglers. May check tomorrow if it doesn't rain, else that's it for this year. Still intend to update the map of site 1 to show the area of the flood plain that was cleared.