Sept 17th: Charged one of the batteries as neither lights would work. Painted two side side below the windows.
Sept 16th: Cleared more flaky paint, fixed cupboard doors, put away cardboard, place some wood in box, taped over some cracks, removed a few items
July 11th:
Removed some flaky paint and part of the ceiling to expose the damp area. It appears as though there was a hole in the roof for a flue. �
May 19th
Re-oiled the roof
2022 October Roof work
October 18th
Have cleaned and re-oiling the roof and re-coated the door
2021 Fixing the door
October 21st
Replacing main door, which is a split (stable) door
November 7th
Spent a few days working on the top. The rebate for the glass will be painted to stop the putty drying quickly by the oil being absorbed by bare wood. The beading will also be painted on the inner sides.
17th Nov: Fitted and temp glazed but requires more work
18th Nov: Tar-oiled the top door. Finished preparing beading
19th Nov: Beading three straight edges
23rd Nov: Fitted pull handle and bolt to lock top to bottom.
24th Nov: Another coating of oil on the 'doors'
2021 Outer paint work
On arrival it was pink and was painted red but that has become very flaky and over the last two days Gavin has used a power grinder with steel brush to bring the surface to a more stable footing.